Will TCC help us with the prerequisites, licences and liaison work to start constructing a new house?

Yes, we will take care of obtaining the required licences from various departments like the City Corporation, MESCOM, Water Supply, MUDA, the Fire Department, Drainage, Pollution Control Board, etc.

What Quality Checks will you perform at the site?

The best quality building materials are essential for quality construction. At TCC, we ensure that the building materials are sourced from the best vendors in the industry and there will be absolutely no compromise in terms of the quality of materials used. Also, we carry periodic quality checks to ensure that the construction quality and durability are in keeping with the highest standards.

Is the compound wall included in the package?

Yes, the compound wall is included. The sump tank, overhead tank, interlocks, gate and waterproofing are also part of the package and will not be charged extra.

Will TCC help us with the prerequisites, licences and liaison work to start constructing a new house?

Yes, we will take care of obtaining the required licences from various departments like the City Corporation, MESCOM, Water Supply, MUDA, the Fire Department, Drainage, Pollution Control Board, etc.

What happens if I want different brands of material other than the ones in the package?

The villas built by us are the best in terms of quality and durability. This is because we use the best brands of materials available in the industry. However, if you have any specific brands of your choice we can certainly use them at customized costs.

How much time will it take to complete the construction of an independent villa?

An independent single floor villa or duplex would take about 9-12 months for completion from the date of signing the Agreement.

Does TCC provide loans as well?

We have partnered with leading banks and NBFCs, and can certainly assist you to get the loan processed.

Does TCC include interiors with the construction?

We provide interiors only for turnkey projects. For non-turnkey projects, interiors can be provided at an additional cost.

What if the prices of the materials increase when the project is ongoing?

From the date of the agreement, there will be price protection for a period of 270 days (9 months). Within this specified period, any change in material cost will not impact the project cost.

What are the major factors on which the house construction cost depends?

The major factors which contribute to the house construction cost would be the bathroom and sanitary fittings, door and window materials, flooring, wooden items, etc.

Will TCC provide an item-wise breakup of costs and also specify the brand names of items?

Yes, TCC will provide the item-wise breakup of costs and also the item-wise break up of brands. This is part of the standard operating procedure.

What is carpet area? What does it include?

The area of the house that you can cover with carpet is called the carpet area. In other words, the carpet area is the actual usable area. It includes the area of bedrooms, living room, kitchen, balconies, toilets, and any other rooms. It does not include the thickness of the inner walls.